Nido Farms
Present-day color aerial of the refuge. Pair with 1972 b&w for reforestation arc.
Our Process

The regenerative plan for Barú.

The land has been on a trajectory since 1976. The work is to read that trajectory, stay inside the decree, and put structured capital alongside it without bending the place out of shape. Below are the four instruments we use, in order, and the four stages that carry Barú from a letter of intent to the first credit tranche — roughly one thousand and eighty days.

The Method

Four instruments. In order.

The sequence is the practice. Story of Place precedes Five Capitals. Five Capitals precede Pattern Literacy. Pattern Literacy precedes the Governed Rail. Step out of order and the project starts serving something other than the place.

  1. 01

    Story of Place

    Before pro-formas, before site plans, Regenesis facilitates a Story of Place process. The Río Barú watershed, the Path of the Tapir corridor, TINTINs Are Made of Chocolate (the Jack Ewing book and the legacy beneath it), the child-as-teacher thesis. The story is what every later decision answers to.

    Source

    docs/projects/baru/RESEARCH.md §6.2 · Regenesis facilitation, Playa Viva precedent

  2. 02

    Five Capitals

    Natural, Human, Social, Built, Financial. The five capitals are scored at baseline and tracked across the hold. Each decision is read for its capital trade-offs, not its IRR alone. This is the language that lets a fiduciary investor and a regenerative practitioner read the same dashboard.

    Source

    docs/projects/baru/RESEARCH.md §6.1 · PRT NAV + INAV framework

  3. 03

    Pattern Literacy

    The patterns the place already exhibits. The 1976 hunting ban, the 1987 first guests, the 1990 reforestation, the 1995 decree. We do not impose a new model on the land; we accelerate the trajectory it has already been on for forty years.

    Source

    Regenesis framework · Hacienda Barú timeline 1972–present

  4. 04

    Governed Rail

    Capital flows through a Reg D 506(c) Delaware Statutory Trust with mission-locked covenants, a paired 501(c)(3) institute, and a CST Elite certification target. The rail is the structure that keeps regenerative intent durable through ownership transitions.

    Source

    PRT thesis · Dos Pueblos Institute pattern

Project Phasing

Four stages. Three years. One trajectory.

From letter of intent to first carbon tranche in roughly 1,080 days. Each stage stacks on the one before it. The full sequence lives in docs/projects/baru/RESEARCH.md §7; what follows is the working summary.

  1. Stage 1 · Days 0–90

    Anchor

    Foundational due diligence + commitment.

    • 01Open Ewing family LOI · secure transactional exclusivity
    • 02Commission Costa Rican counsel to confirm Decreto 24639-MIRENEM + 2014 Plan General de Manejo in good standing
    • 03Stand up Reg D 506(c) SPV · identify 3–5 anchor investors at $1–5M ticket
    • 04Commission ecological baseline (LiDAR canopy, species inventory, soil carbon)
    • 05Engage Regenesis Group for Story of Place scoping
  2. Stage 2 · Days 91–270

    Acquire & Structure

    Close the asset · stand up operating + governance · enroll into PSA · architectural concept.

    • 01Close acquisition through Costa Rican S.R.L. PropCo · target $10–18M
    • 02Stand up OpCo + paired 501(c)(3) institute analogous to Dos Pueblos Institute
    • 03File CST registration with ICT
    • 04Enroll forest hectares into FONAFIFO PSA 2.0
    • 05Commission architectural concept (Atelier Nomadic — designed Playa Viva)
  3. Stage 3 · Days 271–540

    Build & Launch

    Face-lift the 12 existing buildings. Install glamping. Hire core team. Soft-launch with extended family cohort.

    • 01Phase 1 CapEx — refurbish 12 lodging buildings · install 10 glamping units · flagship natural playground · food-forest establishment
    • 02Hire GM + Director of Children's Programming
    • 03Initiate Verra / Plan Vivo carbon scoping
    • 04Soft-launch with extended-family test cohort
    • 05Beyond Green + Regenerative Travel pre-launch placement
  4. Stage 4 · Days 541–1,080

    Scale & Securitize

    Stabilize the operation · achieve CST Elite · issue first credit tranche · open future-flow facility.

    • 01Stabilize ADR / occupancy — yr-2+ band 70-90%
    • 02Achieve CST Elite (Level 5)
    • 03Issue first carbon / biodiversity credit tranche
    • 04Explore future-flow facility analogous to SINAC Law 10,898
    • 05Activate stewardship expansion projects across the greater parcel
The Constraints

What does not change, in any stage.

Regenerative practice begins with naming what is not negotiable. These four sit ahead of every decision in the four stages above. They are the reason the project holds its shape across a long arc.

The refuge boundary

330 hectares · Decreto 24639-MIRENEM · not negotiable

The Plan de Manejo

R-SINAC-CONAC-021-2014 · every new activity passes compatibility review

The Ewing legacy

Family blessing and active board participation are non-negotiable

Hunting still banned

Since Jack Ewing's 1976 decision · the founding regenerative act

What this is for

Regenerative practice that holds its shape.

Four stages, twenty-two units, one refuge — and the same trajectory Jack Ewing began in 1976, now carried by structured capital that knows when to let the place lead. The process keeps regenerative intent from drifting and keeps the capital alongside it.